Mountbatten Water Taxi Entrance Plinth

The brief

Entrance platform required extension to concrete walkway.

Our solution

Installation of concrete plinth foundation.

The outcome

Fabricated Jetty platform can adjust with the tide with the aid of the concrete extension.

Products used:

General building materials

12mm reinforcement

Timber formwork

C40 concrete pour

Curing membrane

Date completed: July 2018